
Briton Ferry Battery Energy Storage Project
Location: South Wales
Scale: 20MW/22MWh
Case study
Location: Hyde, West of Manchester, within the Electricity North West (ENW) region
Scale: 42MW/104MWh
Project status: operational
The Hyde project presented a complex design challenge, integrating battery energy storage system (BESS) assets within a compact, hilly site bordered by a railway bridge and motorway. Supplied by Canadian Solar, these assets have now been energised and have been operating successfully since March 2025.
Location: South Wales
Scale: 20MW/22MWh
Location: Manchester
Scale: 30MW